Which of the followings are the tru definitions about "project scheduling"?
Soru 2
Which of the followings represents the identification of the specific project activities, precedence requirements such as technological, procedural or imposed limitations and the network diagrams?
Soru 3
Which of the followings are one of the components of the network from the project scheduling concept?
Soru 4
What is it called the situation that three tasks are predecessors of a single task In a network?
Soru 5
An activity on arrow network includes 5 events, A, B, C, D and E. In that network, event C depends on event A and event B; event D and event E depend on event C. According to this, which of the following represent the precedence of the C?
Soru 6
Which of the following represents the true definitions about comparison between "activity on arrow (AOA)" and "activity on network (AON)"?
Soru 7
Which of the following is used for drawing of the network which in it is able to be ignored statistical considerations and consider on a single estimate of the mean time needed to carry out the activity?
Soru 8
Which of the followings represent true definitions about the calculations of the mean time and variance in PERT?
Soru 9
The steps of the PERT analysis are presented scratchily as follows. Which of the following represents the right sequences of these processes about the PERT analysis?
Soru 10
PERT is pessimistic about the variance in the project duration. Therefore, if there are multiple critical paths in the project network, which critical path must be chosen to determine the project duration and the variance of the project duration?