Soru 1
Which of the below activity is the one that instantly follows it?
Soru 2
Which of the below occurs when there is a prevalent predecessor for two or more operations?
Soru 3
Which of the below is one of the kinds of data are required to describe a project?
Soru 4
Which of the below is FALSE related to the comparison between AOA and AON?
Soru 5
Which of the below is NOT of the types of the projects that PERT and CPM can be applied to?
Soru 6
Which of the below “a” stands for in the formulas for calculating the mean and standard deviation in PERT?
Soru 7
Which of the below is FALSE related to the major steps in PERT analysis?
Soru 8
Which of the followings are the tru definitions about "project scheduling"?
Soru 9
Which of the followings represents the identification of the specific project activities, precedence requirements such as technological, procedural or imposed limitations and the network diagrams?
Soru 10
Which of the followings are one of the components of the network from the project scheduling concept?
Soru 11
What is it called the situation that three tasks are predecessors of a single task In a network?
Soru 12
An activity on arrow network includes 5 events, A, B, C, D and E. In that network, event C depends on event A and event B; event D and event E depend on event C. According to this, which of the following represent the precedence of the C?
Soru 13
Which of the following represents the true definitions about comparison between "activity on arrow (AOA)" and "activity on network (AON)"?
Soru 14
Which of the following is used for drawing of the network which in it is able to be ignored statistical considerations and consider on a single estimate of the mean time needed to carry out the activity?
Soru 15
Which of the followings represent true definitions about the calculations of the mean time and variance in PERT?
Soru 16
The steps of the PERT analysis are presented scratchily as follows. Which of the following represents the right sequences of these processes about the PERT analysis?
Soru 17
PERT is pessimistic about the variance in the project duration. Therefore, if there are multiple critical paths in the project network, which critical path must be chosen to determine the project duration and the variance of the project duration?
Soru 18
Which of the below is NOT one of the components of the framework for resource management?
Soru 19
Which one of the below is about secondary resources?
Soru 20
What is the correct order for the steps of resource management?

I. Estimate the required quantity of each resource

II. Apply the techniques to aggregate and level the resources

III.Define the necessary resources

IV.Classify the resources